Businesses can’t afford any downtime, especially when users demand speed and constant availability. The solution required a phased migration strategy, starting with isolating reads and writes to give us control over database access. We added in place a logging mechanism that flagged where writes failed and put all discrepancies in a queue.Businesses can’t afford any downtime, especially when users demand speed and constant availability. The solution required a phased migration strategy, starting with isolating reads and writes to give us control over database access. We added in place a logging mechanism that flagged where writes failed and put all discrepancies in a queue.

How We Migrated a Billion-Record Database With Zero Downtime

2025/12/08 04:03

Businesses can’t afford any downtime, especially when users demand speed and constant availability. But what happens when the database supporting your application gets choked from your application’s traffic? This was the situation we encountered while scaling a system with over a billion user records. Therefore, this article describes how we migrated a production database with no downtime, keeping users logged in, transactions flowing, and business running as usual. But before jumping into how we did it, it’s worth asking, why does zero-downtime even matter so much in today’s architecture?

Why Zero-Downtime Matters More Than Ever

In today’s web application development, particularly in SaaS or consumer apps, downtime translates to lost revenue, broken trust, and SLA violations.

When I refer to “zero-downtime,” I mean a migration process where: User-facing endpoints remain fully accessible. No incomplete transactions. No broken sessions or corrupted data. No corrupted data. Building systems to support hundreds of thousands of concurrent users makes it absolutely clear that simple “scheduled maintenance” is a risk you can’t afford. With that goal in mind, let me walk you through the challenge we faced—and how we planned to overcome it.

The Problem: Monolithic DB Under Pressure. We were using a monolithic setup of Postgres with read replicas; however, over time, the schema became a bottleneck. An increasing number of sessions would require a write, which would need to be followed by analytic queries and cron jobs, which would put IOPS through the roof. The two goals we faced were: Transition to a more horizontally scalable system, in this case, distributed Postgres. Positive transition with no downtimes or performance impacts. The solution required a phased migration strategy, starting with isolating reads and writes to give us control over database access.

Step 1: Introducing a read and write proxy layer.

The very first thing we did was create a proxy interface around our database calls. This is very similar to creating a small-scale ORM with awareness of reading and writing. All write requests were marked and routed to the main database, and reads were handled by the replicas. What this did was to allow us to have precise control during the initial stages of migration since we could reroute operations easily. Now, with a clean and solid abstraction layer in code is extremely helpful at this point. Unmanaged and scattered queries increase the amount of work for this single step for weeks. Once we had control over read-write traffic, the next step we took was to keep both systems in sync, without risking data integrity.

Step 2: Dual writes with safety nets.

Our approach was simple; we started by implementing dual writes. For some of our higher traffic models, we did dual writes on both the old and new databases. However, this approach can be risky. What happens if one of the writes fails? In our case, we added in place a logging mechanism that flagged where writes failed. We kept a log of all the failures and put all the discrepancies in a queue. These discrepancies could be resolved in the background without holding up the main process. I ensured that every dual write function had an idempotent built in. This ensured that even when someone is executing the same function multiple times, it had no negative impact. This made re-tries safer and the outcome expected. Dual writes keep the new system updated in real time, and we turned to the heavier lift, migrating the backlog of historical data.

Step 3: Asynchronous Data Backfill

Copying a billion records in one go is impossible, at least not without breaking something. Think of a database crossing a river by stepping on stones, wherein each stone is a 1000-record chunk, and you need to mark the stone as migrated to step safely. That is the approach that was taken by us by setting up a worker queue to handle 1000 record chunks and marking each “migrated” to fully make database usage as efficient as possible.

To avoid “hitting” the database with too much traffic, we combined Kafka and batch processing. A “warmed up” database helped us to focus on active users as a priority. That way, the most valuable and important records are “fetched” in the most efficient manner. When the new database warmed up and got tested, we began the careful process of shifting live traffic, gradually and safely.

Step 4: Feature Flags for Safe Cutover

We had an over 95% success rate of our writes in the new system, and reads showed parity. We enabled a feature flag to switch to the new database for a small portion of traffic. We did this using LaunchDarkly. As our confidence increased, we extended the rollout to 100%. If you haven't started using feature flags for infrastructure changes, this is your sign. It changes everything from a constant gamble to a methodical approach. Switching over is just one half of the process. The other half is verifying that it worked and being prepared for what might break.

Step 5: Post-Migration Verification

Our job wasn’t done until we verified the following: Snapshot comparisons between old and new DBs, Query performance benchmarks, Fallback support in case we needed to roll back. We also left read-only access to the old system live for two weeks, just in case we needed to run forensic checks. After everything was in place, we reflected on what made this migration successful and what we’d do differently next time. Lessons Learned: Start with abstraction. Your migration is only as smooth as your system’s modularity. Test for reality. Load test every read, write, and edge cas,e not just happy paths. Keep observability high. Logs, metrics, tracing this isn't optional when migrating live systems. Design for humans.

Developers fear migrations because they’ve been burned before. Build tooling that makes it safe and explainable. Final Thoughts: These takeaways proved essential, but the broader lesson was that relocating a billion-user database is not a casual weekend task; it is a milestone in engineering achievement. However, it is completely achievable with the proper tools, frameworks, and attitude, all while preserving the user experience. My two cents after training thousands of developers at Sumit’s platform is that zero downtime is not a marketing term; it is a genuine phrase based on concern for the users, team, and the developers themselves.

Disclaimer: The articles reposted on this site are sourced from public platforms and are provided for informational purposes only. They do not necessarily reflect the views of MEXC. All rights remain with the original authors. If you believe any content infringes on third-party rights, please contact service@support.mexc.com for removal. MEXC makes no guarantees regarding the accuracy, completeness, or timeliness of the content and is not responsible for any actions taken based on the information provided. The content does not constitute financial, legal, or other professional advice, nor should it be considered a recommendation or endorsement by MEXC.

You May Also Like

Why Tom Lee’s BitMine Is Buying Ethereum (ETH) Aggressively Despite Market Fear

Why Tom Lee’s BitMine Is Buying Ethereum (ETH) Aggressively Despite Market Fear

BitMine Immersion Technologies, the largest corporate holder of Ethereum (ETH), has doubled down on its acquisition of ETH in December, highlighting confidence in the asset. The renewed buying comes despite a tough environment for Ethereum. Rising exchange inflows and ongoing exchange-traded fund (ETF) outflows point to short-term pressure across the market. BitMine Scoops Up 138,452 ETH in a Week, Now Controls 3.2% of Supply According to a recent disclosure, BitMine acquired 138,452 ETH last week, representing a 156% increase over the previous four weeks. Its total holdings stand at 3.86 million ETH. This accounts for over 3.2% of Ethereum’s circulating supply. Furthermore, it puts BitMine two-thirds of the way toward its goal to control 5% of ETH’s supply. Since adopting ETH as a reserve asset, BitMine has continued to make large-scale purchases. Between June 30 and October 5, BitMine accumulated 2.83 million ETH. Since October 5, it has added another 1.03 million ETH to its holdings. Ethereum’s weakness throughout the fourth quarter makes BitMine’s steady accumulation even more notable. Since early October, ETH has shed about 24.8% of its value, reflecting persistent downward pressure. December has offered a small break from that trend. The price has climbed more than 4% since the start of the month, and with it have climbed BitMine’s ETH purchases. According to BitMine Chairman Tom Lee, the company’s accelerated purchasing activity reflects its confidence that ETH will likely see gains in the coming months, supported by several key catalysts. These include the Fusaka upgrade, which was activated last week and delivers meaningful improvements to Ethereum’s scalability, security, and overall network efficiency. BitMine also points to the broader macro backdrop, with the Federal Reserve ending quantitative tightening and potentially introducing another interest rate cut tomorrow. Together, these developments form the basis for the company’s view that market conditions could turn more supportive for ETH after weeks of volatility. “We are now more than 8 weeks past the October 10th liquidation shock event, a sufficient length of time to allow crypto to again trade on forward fundamentals,” Lee added. Market Conditions Point to Near-Term Volatility Despite this, on-chain data signals caution. CryptoOnchain noted that Ethereum exchange netflow to Binance has surged. The exchange received 162,084 ETH on December 5, 2025. This was the largest single-day inflow of ETH to the exchange since May 2023. Large deposits on exchanges often suggest impending sell pressure, since investors typically transfer tokens to platforms before liquidating. “Given the magnitude of this inflow, market participants should remain cautious. A supply shock of this size, if executed as market orders, could lead to heightened volatility or a short-term price correction,” the analyst stated. Furthermore, Ethereum exchange-traded funds are also signaling weakened demand. The ETFs experienced a record $1.4 billion in net outflows in November 2025, marking the largest monthly withdrawal on record. The trend has continued into December. According to SoSoValue, an additional $65.59 million exited ETH-focused ETFs in the first week of the month. “Historically, ETF flow reversals tell you more about liquidity pressure than about long term fundamentals. When redemptions spike, it’s usually a sign that broader risk sentiment is cracking, not that the asset itself broke. If ETF outflows continue, near term price action stays choppy as liquidity gets drained at the edges,” Milk Road posted. The ongoing divergence between direct accumulation and ETF redemptions highlights a market split, with retail and institutional players following diverging strategies regarding Ethereum’s outlook.
Share
Coinstats2025/12/09 16:08