TLDRs; Kia completes first phase of Hwaseong EVO Plant, aiming to produce 100,000 PV5 modular EVs yearly. The two-plant project involves a $2.7B investment and spans 300,000 square meters in Gyeonggi Province. The west section, opening in 2027, will assemble larger PBVs with annual output of 150,000 vehicles. Kia strengthens modular EV strategy with PBV [...] The post Kia Opens New Hwaseong EVO Facility, Targets 100,000 Modular EVs Annually appeared first on CoinCentral.TLDRs; Kia completes first phase of Hwaseong EVO Plant, aiming to produce 100,000 PV5 modular EVs yearly. The two-plant project involves a $2.7B investment and spans 300,000 square meters in Gyeonggi Province. The west section, opening in 2027, will assemble larger PBVs with annual output of 150,000 vehicles. Kia strengthens modular EV strategy with PBV [...] The post Kia Opens New Hwaseong EVO Facility, Targets 100,000 Modular EVs Annually appeared first on CoinCentral.

Kia Opens New Hwaseong EVO Facility, Targets 100,000 Modular EVs Annually

2025/11/18 01:42

TLDRs;

  • Kia completes first phase of Hwaseong EVO Plant, aiming to produce 100,000 PV5 modular EVs yearly.
  • The two-plant project involves a $2.7B investment and spans 300,000 square meters in Gyeonggi Province.
  • The west section, opening in 2027, will assemble larger PBVs with annual output of 150,000 vehicles.
  • Kia strengthens modular EV strategy with PBV Conversion Center for specialized model development.

Kia Motors has officially completed the first phase of its highly anticipated Platform Beyond Vehicle (PBV) factory, dubbed the EVO Plant, in Hwaseong, Gyeonggi Province.

The new facility represents a major milestone in Kia’s push into modular electric vehicles (EVs) designed for versatile commercial applications. The east section of the plant, now fully operational, will focus on producing the PV5 model, targeting an annual output of 100,000 units.

This strategic initiative forms part of a broader two-plant project, covering approximately 300,000 square meters, with a total investment of around 4 trillion won (US$2.7 billion). The modular EV approach is central to Kia’s long-term plan to offer flexible vehicles that can adapt to various commercial purposes, from urban delivery to specialized service applications.

West Section to Expand Production by 2027

The second phase of the EVO Plant, located on the west side, is scheduled to begin operations in 2027. This section will focus on assembling larger PBVs such as the PV7, with an anticipated annual capacity of 150,000 vehicles.

By gradually scaling production across both plant sections, Kia aims to position itself as a leader in modular EVs not only in South Korea but across global commercial markets.

In addition, Kia plans to operate a PBV Conversion Center within the Hwaseong complex. This facility will enable the development of specialized models in collaboration with partner firms, ensuring a broad and adaptable product lineup. The move signals Kia’s intention to embrace both innovation and collaboration as key drivers of its modular EV strategy.

Strengthening EV Presence in Europe

Kia’s modular EV expansion aligns closely with its ongoing efforts to solidify its footprint in Europe’s growing EV market.

Earlier this year, the company made a high-profile return to the IAA auto fair, showcasing seven new EV models, including the PV5 electric van and the European debut of the EV5 mid-sized SUV.

The company’s compact EV strategy has already yielded strong results, with the EV3 compact SUV achieving nearly 40,000 sales in Europe between January and July 2025. This model accounted for 64% of Kia’s total EV sales in the region, proving the automaker’s focus on smaller, practical vehicles resonates with European consumers.

A Vision for Modular Mobility

Kia’s investment in the Hwaseong EVO Plant represents more than just production capacity, it is a cornerstone of the company’s broader vision for modular mobility.

By creating vehicles that can be tailored for various commercial applications, the automaker is addressing a growing demand for flexible, sustainable transportation solutions.

With the east section now operational and the west section slated for completion in 2027, Kia is positioning itself for long-term growth in the modular EV market. Coupled with its European expansion and strategic EV lineup, the automaker is signaling a comprehensive commitment to electric mobility, innovation, and market leadership.

The post Kia Opens New Hwaseong EVO Facility, Targets 100,000 Modular EVs Annually appeared first on CoinCentral.

Disclaimer: The articles reposted on this site are sourced from public platforms and are provided for informational purposes only. They do not necessarily reflect the views of MEXC. All rights remain with the original authors. If you believe any content infringes on third-party rights, please contact service@support.mexc.com for removal. MEXC makes no guarantees regarding the accuracy, completeness, or timeliness of the content and is not responsible for any actions taken based on the information provided. The content does not constitute financial, legal, or other professional advice, nor should it be considered a recommendation or endorsement by MEXC.

You May Also Like

American Bitcoin’s $5B Nasdaq Debut Puts Trump-Backed Miner in Crypto Spotlight

American Bitcoin’s $5B Nasdaq Debut Puts Trump-Backed Miner in Crypto Spotlight

The post American Bitcoin’s $5B Nasdaq Debut Puts Trump-Backed Miner in Crypto Spotlight appeared on BitcoinEthereumNews.com. Key Takeaways: American Bitcoin (ABTC) surged nearly 85% on its Nasdaq debut, briefly reaching a $5B valuation. The Trump family, alongside Hut 8 Mining, controls 98% of the newly merged crypto-mining entity. Eric Trump called Bitcoin “modern-day gold,” predicting it could reach $1 million per coin. American Bitcoin, a fast-rising crypto mining firm with strong political and institutional backing, has officially entered Wall Street. After merging with Gryphon Digital Mining, the company made its Nasdaq debut under the ticker ABTC, instantly drawing global attention to both its stock performance and its bold vision for Bitcoin’s future. Read More: Trump-Backed Crypto Firm Eyes Asia for Bold Bitcoin Expansion Nasdaq Debut: An Explosive First Day ABTC’s first day of trading proved as dramatic as expected. Shares surged almost 85% at the open, touching a peak of $14 before settling at lower levels by the close. That initial spike valued the company around $5 billion, positioning it as one of 2025’s most-watched listings. At the last session, ABTC has been trading at $7.28 per share, which is a small positive 2.97% per day. Although the price has decelerated since opening highs, analysts note that the company has been off to a strong start and early investor activity is a hard-to-find feat in a newly-launched crypto mining business. According to market watchers, the listing comes at a time of new momentum in the digital asset markets. With Bitcoin trading above $110,000 this quarter, American Bitcoin’s entry comes at a time when both institutional investors and retail traders are showing heightened interest in exposure to Bitcoin-linked equities. Ownership Structure: Trump Family and Hut 8 at the Helm Its management and ownership set up has increased the visibility of the company. The Trump family and the Canadian mining giant Hut 8 Mining jointly own 98 percent…
Share
BitcoinEthereumNews2025/09/18 01:33